VR Walk through completed plant room

Challenge

Wye Leisure, a family run Health and Leisure Club in Herefordshire had an existing water heating system that had grown organically, as the business had added more spa’s, buildings and thermal loads. This resulted in four independent hydraulic systems, each operating with virtually no controls, meaning the condensing boilers were not actually condensing and had a very high gas consumption for the system they were operating.
Helec were invited at first to provide  -designed the system to run all the circuits from a common boiler run with lower temperatures and a higher Delta T to ensure the maximum efficiency was achieved by the new boilers and CHP.

Wye Leisure had a mixture of existing small plant rooms around the site with old inefficient boilers.
Due to the large site electrical usage to power the equipment and site services

Solution

Outcome